High-speed trains travel through tunnels at speeds of up to 300 km/h. The equipment installed here must therefore be able to withstand the extreme and variable aerodynamic pressures - a great technical challenge. The central component of each tunnel unit is the combined socket box. The highest demands are placed on them in terms of stability and strength. Our specially developed modular socket boxes provide you with reliable support during demanding work and in tunnel applications.